Aggressive Aeration advert image shown if present

Image shown for entry if relevant and present

The action of intensive aeration for use in heavily compacted areas which leaves behind open holes; therefore, solid tining, hollow-tining or drill aeration. The activity is carried out in 3 or 4 directions, during one maintenance session. This will result in very closely spaced holes, potentially creating holes in an estimated 15% to 20%, or so, of the surface area.